Chelmsley Wood sits in the north of Solihull borough, between Marston Green, Kingshurst, Smith’s Wood and Fordbridge, with the airport and the NEC just to the south. It’s one of the youngest places in the Midlands: a whole town built in a few short years in the late 1960s on what had been woodland and farmland. Birmingham based, covering the whole of the Midlands, our plasterers at RCR Connections Ltd work in homes right across Chelmsley Wood and the neighbouring estates, from original council houses and maisonettes to the new homes built during the regeneration of North Solihull.
Below you’ll find the story of how the town was planned and built, what its unusual layout means when a plasterer comes to work, the types of home you’ll find here and the problems each one tends to have, and plenty of practical advice for homeowners, leaseholders, tenants and landlords.
Free, no-obligation quote in Chelmsley Wood: WhatsApp me on 07453 614095 with a few photos, or send us a message.
A town built from scratch
The bluebell wood
Before the houses came, Chelmsley Wood was a real wood. Solihull Council’s history of the area describes how people from Birmingham would come in large numbers to picnic there, especially on bank holidays. They arrived by train at Marston Green station, and the village tea rooms did a roaring trade; Alcott Hall Farm sold pots of tea too. The wood was part of the old Forest of Arden. Chelmsley Wood Town Council notes that the site of the original enclosure and Anglo-Saxon settlement of Chelmsley is unknown.
Birmingham runs out of room
The Second World War destroyed thousands of homes in Birmingham, and for years afterwards hardly any were built. When building resumed, the city also restarted slum clearance so the centre could be redeveloped. Large estates such as Druids Heath went up inside the city boundary, but by the 1960s there was no large site left. In November 1963 Birmingham City Council took the decision that led to Chelmsley Wood.
Objections and approval
A public inquiry was held in May 1964. Meriden Rural District Council and the parish councils of Bickenhill, Castle Bromwich and Coleshill all objected strongly. Permission was granted anyway, and the new estate was given its name in February 1965, after the much-loved wood.
Building the town
The land was bought by compulsory purchase, and the council’s history says building started in 1966 and finished in 1970. Houses, low-rise flats, maisonettes and many multi-storey blocks were built in that short time. The area joined the new Metropolitan Borough of Solihull in 1974, but Birmingham kept control of its council houses until they were formally handed to Solihull on 29 September 1980.
Sources that disagree
Some secondary sources give 1965 as the start of building, rather than the council’s 1966. They also give different dates for the opening of the shopping centre (7 April 1970) and an official opening of the town centre by the Queen (7 April 1972). We’ve followed Solihull Council’s account for the building dates.
The Radburn layout
Back to front
The council’s history explains that the town centre and much of the housing were designed to keep cars and people apart, in what’s called a Radburn layout. Houses back onto the roads, while their front doors open onto shared paths and green spaces. That was meant to make walking safer, and it gave the estate its distinctive feel.
What it means for a plastering job
For a plasterer, a Radburn layout changes the logistics. The van often parks in a garage court or on a road behind the house, and everything is carried along the path to the front door, or brought through the back garden gate. Before we start, we’ll ask:
- where the nearest legal parking is,
- whether the back gate opens onto the road,
- how far the walk is with bags of plaster and sheets of board,
- whether there are steps or narrow alleyways on the way.
Large plasterboard sheets don’t fit easily through narrow gates, so on some jobs we use smaller boards or cut sheets outside. Knowing this in advance keeps the job running smoothly.
Wind and exposure
The planners tried to place buildings so they wouldn’t create wind tunnels, but the council’s own history admits that wasn’t fully achieved. Exposed end walls and gable ends feel the wind most, and they’re usually the coldest walls inside. Cold walls attract condensation and mould, so these are the walls where insulated lining pays off most.
The town centre and Chelmund’s Cross
The original town centre was planned as an undercover shopping area on a single level, with offices, pubs and flats above the shops. The council’s history says the flats were included so the centre wouldn’t feel lifeless after the shops closed.
During the regeneration of North Solihull, the old Craig Croft precinct was replaced by the new Chelmund’s Cross village centre, with a new primary school, a new church and community centre, shops, and an enterprise centre beside a new Chester Road junction. A Toucan crossing replaced a subway. Flats above shops are still common around the centre, and they bring their own plastering questions, which we cover below.
Regeneration of North Solihull
In May 2005 Solihull Council signed a regeneration agreement with partners including Bellway Homes, a housing association and a commercial developer, to transform Chelmsley Wood, Smith’s Wood, and Kingshurst and Fordbridge over fifteen years. The partnership’s own review describes demolitions of poor-quality homes and several tower blocks, including the Nuffield and Worcester blocks in 2010, and new homes for sale and rent at places such as Oxford Grove, Oaklands, Fillingham Court and Montford Rise. New primary schools and village centres were built at Chelmund’s Cross and Smith’s Wood.
The result is that today’s Chelmsley Wood mixes original 1960s housing with homes built in the last twenty years, and each type needs a different approach.
Chelmsley Wood today
Chelmsley Wood now has its own town council, and the town council notes that most locals simply call the place Chelmsley. Half a century on, the estate has matured: trees planted in the 1960s have grown up, many homes have been extended and improved by their owners, and new streets from the regeneration sit alongside the originals. For anyone planning work, that means a wide mix of building types within a short walk of each other, from concrete-framed flats to brick terraces and new timber-framed homes.
Neighbouring areas
Kingshurst
Kingshurst means “king’s wood”. Solihull Council’s history says it was part of Coleshill parish for centuries, became a parish in its own right on 1 April 1956 and joined Solihull in 1974. Kingshurst Hall, a red brick house rebuilt in the early 18th century, was demolished in 1962; its moat and mound survive, and Yorkswood keeps the name of the York family, who were once tenants there. Most of today’s Kingshurst grew with Birmingham’s expansion in the 1960s.
Who owned Kingshurst
The council’s history traces Kingshurst through some colourful owners. Around 1352 it belonged to Peter de Montfort; after his death it passed to his son Richard, and it was later reunited with Coleshill under William Mountford. When Sir Simon Mountford backed Perkin Warbeck’s failed claim to the throne, his lands were confiscated in 1495, and Henry VII granted Kingshurst and Coleshill to the Digby family. The Mountfords got Kingshurst back in 1529, but it was sold to the Digbys again around 1617. Tenants over the centuries included the Bull, York and Townshend families.
Smith’s Wood and Fordbridge
Smith’s Wood and Fordbridge were built in the same period as Chelmsley Wood and joined Solihull with it in 1974. Smith’s Wood has its own new village centre from the regeneration, with shops, a library and community space, and new homes built on the site of two demolished tower blocks.
Marston Green
The older village of Marston Green lies to the south, with its railway station, which opened in 1838 on the London and Birmingham Railway. It grew into a suburb in the inter-war years, so its housing is mostly older than Chelmsley Wood’s.
Homes you’ll find here
Original council houses
Most of the original homes are two-storey houses in terraces and short blocks. Many have since been bought by their tenants. Inside, the walls are usually brick or block finished with a thin coat of gypsum plaster, and ceilings are plasterboard with a skim or textured finish. After more than fifty years, typical problems are cracked ceilings along board joints, blown plaster around windows, and damage from years of fixings and redecoration.
Low-rise flats and maisonettes
Maisonettes have two floors, often above shops or garages, or stacked above another flat. They share floors, ceilings and walls with neighbours, so fire safety and sound matter. Leaseholders usually need the freeholder’s permission for anything beyond decoration and simple repairs.
Tower blocks
Several tower blocks have been demolished, but others remain. Flats in high blocks have concrete walls and ceilings, and plastering them is mainly a matter of skimming or patching rather than structural change. Getting materials up in the lift, protecting communal areas and keeping fire doors and fire stopping intact are all part of the job.
Regeneration homes
The new homes are timber or masonry with plasterboard linings. They’re warm and well built, but new homes always settle in their first few years, and cracks at board joints and around door frames are normal. We fix these properly rather than just filling them.
Original 1960s interiors: what we see
Ceilings
Many ceilings are plasterboard that has never been replaced. Common faults are cracks along the joints, sagging boards where nails have rusted or pulled through, and old textured coatings. Sound boards can be skimmed; sagging ones need screwing back first or replacing.
Textured coatings
Textured finishes were very popular on ceilings of this era. Anything put up before 2000 could include asbestos, so get a sample tested before any sanding, scraping or drilling. If asbestos is found, it can usually be sealed and skimmed over, or overboarded, without disturbing it.
Walls
Walls are usually blockwork with a gypsum finish. Over the years plaster comes loose around window frames where condensation has been running down, and behind radiators where heat has dried it out. We cut back loose plaster, reapply the background coat and skim.
Window reveals
Replacement windows have been fitted in most homes, often leaving rough reveals, gaps and loose plaster. We fix beads and re-plaster the reveals neatly, and insulated reveal boards can help reduce condensation round the frame.
Condensation, mould and cold walls
Condensation is the most common complaint we hear about in homes of this age. Warm, moist air from cooking, washing and breathing settles on the coldest surfaces, which are usually the outside walls, corners and window reveals. Mould follows.
Reducing it
- Use extractor fans and lids on pans when cooking.
- Dry clothes outside or in a vented dryer where possible.
- Keep trickle vents open and air rooms each day.
- Keep furniture slightly away from outside walls.
- Heat rooms steadily rather than in short bursts.
Treating it
Clean mould with a suitable fungicidal wash, let the wall dry and repaint with a mould-resistant paint. Where plaster has broken down, we remove it and re-plaster. For walls that stay cold, insulated plasterboard bonded to the wall and skimmed raises the surface temperature and reduces condensation.
Tenants of social landlords
Many homes here are rented from Solihull Council or a housing association. If you’re a tenant, report damp and mould to your landlord first; repairs to the structure are usually their responsibility.
Flats: rules and practicalities
Permission
If you own a flat or maisonette on a lease, check your lease before work. Removing walls, changing ceilings between flats or altering the entrance door usually needs consent.
Fire safety
Walls and ceilings between flats and the communal stairs are part of the building’s fire protection. Holes for pipes and cables must be sealed with fire-rated materials, and replacement boards must be of the right fire rating. We’ll check what’s needed before we start.
Neighbours
Plastering is quieter than most building work, but mixing, stripping old plaster and fixing boards do make some noise. We keep to sensible hours, protect lifts and corridors, and clear up each day so communal areas stay clean.
Owners who bought their council home
Many families bought their homes under the Right to Buy, and these houses are now often on their second or third owners. Common projects include:
- knocking the kitchen and dining room into one,
- converting the loft,
- adding a ground-floor extension or porch,
- turning a garage or store into a room,
- re-plastering the whole house before redecorating.
Load-bearing walls need a structural engineer’s design and building control approval before they come out. We work alongside your builder, plastering once the steelwork has been fitted and inspected.
Room by room in a 1960s house
Living room
Living rooms often have old fireplaces boarded over, cracks above the window and patched walls from years of fixings. A full skim makes the room look new.
Kitchen
Older kitchens often have damaged plaster behind the units and tiles. When a kitchen is replaced, we repair the walls before fitting so the new units sit against a flat, sound surface.
Bathroom
Bathrooms in these homes often have small windows and poor ventilation. Moisture-resistant boards, a good extractor fan and the right backer boards behind tiles all help.
Bedrooms
Bedrooms with two outside walls are often the coldest in the house. Insulated lining on the outside walls makes them warmer and helps stop mould.
Landing and stairs
The stairwell ceiling is often cracked, and the walls are scuffed from years of moving furniture. A stable platform over the treads lets us reach the full height safely.
New homes from the regeneration
Settlement cracks
In the first few years, new homes dry out and settle. Fine cracks at the joints between boards, in corners and around door frames are common. They’re cosmetic, but they look untidy. The best time to repair them is after the first year or two, once most movement has stopped.
Nail pops
Small round bumps appearing on walls and ceilings are nail or screw heads pushing through the finish as the timber shrinks. We drive them back, add an extra fixing and make good.
If your home is new
Report defects to the builder first. After that, we can carry out repairs.
Flats above shops
Flats over shops have their own challenges. The floor between the shop and the flat must keep its fire separation, so any ceiling work on the shop side, or floor work on the flat side, has to keep the right fire-rated layers. Kitchen smells and noise from the shop below can often be reduced by sealing gaps around pipes and adding a resilient layer under a new ceiling. Access is often up a rear staircase, so we plan deliveries around opening hours.
Garage courts and stores
Many houses have a separate garage in a nearby court, or an outside store attached to the house. Turning an attached store into a utility room or downstairs toilet is a popular change. The walls are usually single-skin brick and need lining with insulated board and a skim; a new ceiling with insulation above keeps the room warm. Building regulations apply when a store becomes a habitable room or gets plumbing.
Help with adaptations
If someone in your home is disabled, Solihull Council can assess whether you qualify for a Disabled Facilities Grant towards adaptations such as level-access showers, ramps and wider doors. These projects usually involve some plastering once the main work is done: making good around new doorways, boarding the walls of a wet room ready for tiles, and fixing supports behind the wall for grab rails. Apply to the council before work starts, as grants aren’t usually paid for work already done.
Plaster or dry lining?
Two main methods are used to finish inside walls:
- Wet plaster: a background coat on brick or block, then a finish coat. It’s solid and hard-wearing, and good for patch repairs where the rest of the wall is plaster.
- Dry lining: plasterboard fixed to the wall, then skimmed or taped and filled. It’s quicker to dry, can include insulation and is useful where the old wall is very uneven.
In 1960s houses, either can work. We choose the method that suits the wall, the room and how soon you want to decorate.
Skimming onto concrete
Flats in the remaining blocks often have concrete ceilings and some concrete walls. Concrete is smooth and doesn’t soak up water, so plaster won’t grip it without help. We apply a bonding primer first, then a bonding coat if the surface is uneven, and finish with a skim. Fixing into concrete also needs the right drill bits and plugs, so ask if you’re planning shelves or a television bracket.
Chasing for cables
When sockets are moved or added, cables are buried in channels cut into the wall. In blockwork this is straightforward; in concrete it’s slower and dustier. Once the electrician has finished, we fill the chases, bridge them with tape and skim so they don’t crack or show.
Moving into a new home
If you’ve just bought or been given the keys to a home in Chelmsley Wood, here’s a simple order to work in:
- Check for damp, leaks and loose ceilings first.
- Get any rewiring and plumbing done next, while the rooms are empty.
- Then plaster: ceilings first, then walls.
- Let everything dry.
- Finally, decorate and lay new flooring.
Doing things in this order avoids damaging new decoration and carpets.
Wallpaper on new plaster
New plaster soaks up paste quickly, so wallpaper can slide or fail to stick. Seal the dry plaster with a coat of diluted paste, called sizing, before hanging paper. Lining paper under heavy or patterned papers gives an even base. Leave new plaster to dry fully first, or the paper may bubble.
Summer and winter
In hot weather, fresh plaster can dry too quickly near sunny windows or radiators, which leads to cracking. We keep windows shaded and avoid heating the room hard. In cold weather, the opposite is true: plaster dries slowly and mustn’t freeze. Rooms should be kept warm and ventilated so moisture can escape.
Small fixes you can do yourself
Hairline cracks in painted walls can usually be filled with a flexible decorator’s filler and repainted. Small holes from picture hooks need only a ready-mixed filler. Larger holes, loose patches, cracks that keep coming back and anything on the ceiling are better left to us.
Finishes for busy family homes
Hallways, stairs and children’s rooms take a lot of knocks. Metal corner beads on external corners, a hard-wearing finish plaster and a washable paint all help walls stay looking good. Where scuffs are worst, a dado rail or tough wall panelling protects the lower part of the wall.
Lofts in 1960s houses
Many houses built in the 1960s have roofs made from trussed rafters: factory-made triangles with diagonal timbers running across the loft. They’re strong and light, but the diagonal pieces fill the space, so a loft conversion means redesigning the roof structure with new beams and an engineer’s calculations. It’s still possible in many homes, but more involved than in older houses with traditional roofs. Once the structure, insulation and fire protection are signed off, we board and skim the walls, sloping ceilings and dormer cheeks.
Fire safety in a converted loft
Adding a floor in the roof changes the escape route from the top of the house. Building regulations usually require a protected stair, with fire-resisting walls and ceilings and suitable doors, leading down to an exit. Plasterboard and its skim are part of that protection, so the right type and thickness of board matters. Building control will check this before signing the work off.
Top-floor flats and cold ceilings
Mould often appears along the top of outside walls and across the ceiling edges in top-floor flats and bungalows. These areas are cold because insulation in the roof doesn’t always reach the very edge, and warm, damp air meets the cold surface. Improving loft insulation at the eaves, while keeping ventilation gaps clear, helps. Inside, mould is cleaned off and the plaster repaired; in persistent cases, an insulated board on the ceiling edge can be added.
Shared walls in terraces
If you plan work that cuts into a wall shared with next door, such as fitting a steel beam into it, the Party Wall Act usually applies. You’ll need to give your neighbour notice before the work starts. Skimming or re-plastering your side of the wall doesn’t normally need notice, but it’s still good to let neighbours know when noisy work is planned.
Traffic and aircraft noise
Homes near the M6, the M42, Chester Road and the airport’s approach can be noisy. Acoustic plasterboard is denser than standard board and blocks more sound. On ceilings, fixing the board to resilient bars stops sound travelling through the timber joists. On walls, a separate lining with insulation in the gap gives the best results. Sealing gaps around pipes and sockets makes a surprising difference too.
Turning a rental round
For landlords, empty weeks between tenants are lost rent, so repairs need to be quick and reliable. Take dated photos at the end of each tenancy to help with deposit claims, then send them to us so we can plan. We can patch holes from fixings, repair scuffed corners, fix sagging or stained ceilings and skim worn rooms, so the decorator and cleaner can follow straight on.
Which plaster goes where
- Kitchens and bathrooms: moisture-resistant board, with cement-based backer board behind tiles in showers.
- Bedrooms and living rooms: standard plasterboard or gypsum plaster, with insulated board on cold outside walls.
- Ceilings between flats: fire-rated board.
- Walls next to noisy roads or neighbours: acoustic board.
- Concrete surfaces: bonding primer and bonding coat before finishing.
What to tell us when you get in touch
A quick message with a few details saves time:
- your street or postcode,
- which rooms, and roughly how big,
- whether it’s a skim, a full re-plaster or new boards,
- any damp, leaks or textured coatings,
- how we get to the door, especially if parking is round the back,
- when you’d like the work done.
Photos of each wall and ceiling, plus a wider shot of the room, help us give you a useful reply.
Asbestos in other places
Textured ceilings aren’t the only place asbestos turns up in homes of this age. Boards boxing in pipes, panels in airing cupboards and behind heaters, old floor tiles and some soffits could contain it. If you’re planning to strip out a kitchen, open up a boxing or remove a cupboard, an asbestos survey first is sensible. We won’t cut, drill or sand anything suspicious until it’s been checked.
Water coming through from the flat above
In flats, a great many ceiling repairs start with water from the home above. Let your neighbour know straight away, and if you can’t reach them, contact the freeholder or landlord. Responsibility depends on where the leak came from and what your lease says, so take photos and keep a note of dates. With the source sorted and the boards dry, we can repair or replace the damaged area.
Damp in ground-floor flats and houses
In ground-floor homes built in the 1960s, damp is more often caused by condensation, leaking pipes buried in the floor, or soil and paving built up against outside walls than by true rising damp. Find the cause before re-plastering. Pressure-testing the heating and water pipes is a quick way to rule out a hidden leak.
Airing cupboards and boiler moves
When an old hot-water cylinder is removed, or a boiler is moved into the loft or another room, it leaves holes, unused pipe routes and patched walls. Once the heating engineer has finished, we can board out the old cupboard, fill the holes and skim the walls so the space can be used again.
Working to a deadline
If you’re moving in, hosting a family event or have a tenant due, tell us your date. Dry lining with board and a skim dries faster than backing coats, and planning the order of rooms means some are ready to decorate while others are still being plastered.
Polystyrene ceiling tiles
Polystyrene tiles were a popular quick fix in the 1960s and 70s, and some homes still have them, often painted over many times. They can help fire spread, so they’re best removed. Taking them down leaves blobs of adhesive and a damaged surface, so the ceiling is usually scraped, primed and skimmed, or overboarded if the damage is bad.
Serving hatches and old doorways
Many homes of this era had a serving hatch between kitchen and dining room, and some have doorways that are no longer needed. We fill these openings with studwork or blockwork, board or plaster them, and skim the whole wall so the patch disappears. If the opening is in a load-bearing wall, it can usually just be filled, but check with building control if you’re unsure.
Plastering and rendering we carry out
- Skimming walls and ceilings
- Re-plastering after damp or damage
- Overboarding and replacing ceilings
- Plasterboard for extensions, loft rooms and new partitions
- Insulated lining for cold walls
- Patching after rewires, plumbing or new windows
- Coving and cornice
- External render: K-Rend monocouche, silicone, or sand and cement
A typical job, start to finish
- You send photos and rough room sizes over WhatsApp to 07453 614095.
- We reply with a rough figure and, for bigger jobs, arrange to come and see it.
- We agree a start date and how long it will take.
- On the day, we lay floor protection and sheet up furniture.
- Loose or damaged plaster is removed and beads fitted.
- Background coats go on where needed.
- The finish coat is applied in two layers and trowelled smooth.
- We tidy up and remove waste.
- Before we leave, we explain how to look after the new plaster.
Getting ready for us
- Clear as much from the room as you can.
- Take down curtains, blinds and anything on the walls.
- Faceplates on sockets and switches should be unscrewed and eased forward by an electrician.
- Let us know the best way to bring materials to the door.
- If you’re in a flat, check if the lift or stairs need booking.
Drying and decorating
A skim usually needs several days to dry, and backing coats need longer. Keep rooms warm and aired. Once there are no dark, damp patches left, put on a first coat of thinned matt emulsion, then decorate as normal. Our drying time article explains more.
Rendering in North Solihull
Some houses and blocks in the area have been rendered or clad as part of improvement works. We also render privately owned houses in silicone and K-Rend monocouche, as well as sand and cement. See our K-Rend monocouche page and our rendering in Solihull page.
Areas near Chelmsley Wood
We work across Chelmsley Wood, Kingshurst, Smith’s Wood, Fordbridge, Marston Green and Coleshill Heath. See plastering in Castle Bromwich, plastering in Marston Green, plastering in Sheldon, plastering in Solihull, plastering in Birmingham, and all the areas we cover.
Chelmsley Wood homes we plaster
Chelmsley Wood and the estates around it were mostly built in the 1960s and 70s, with older homes in Marston Green and Kingshurst. Here’s where we work most, the homes you’ll find there and the plastering jobs that come up.
- Chelmsley Wood centre. Flats, maisonettes and houses near the shopping centre. Patch repairs and repairs between tenants.
- Kingshurst. 1950s and 1960s homes. Artex ceilings covered and rooms replastered after a rewire.
- Fordbridge. Post-war estates. Textured ceilings and ceilings after leaks.
- Smith’s Wood. 1960s and 1970s houses. Full room replasters and kitchen extensions.
- Bacons End. 1970s homes. Garage conversions and cracked plasterboard.
- Marston Green. Older village houses and 1930s semis. Through lounges and bay windows.
- Coleshill Heath. Newer homes and older houses. Loft rooms and extensions.
Whatever the house, RCR Connections Ltd puts 62 years of combined experience into it. We’re Birmingham based, covering the whole of the Midlands, and we work Monday to Friday 7am to 5pm and Saturday 7am to 1pm. WhatsApp me on 07453 614095 or message the page with photos of the room and your road or postcode in Chelmsley Wood.
Outside, we also fit K-Rend monocouche and silicone render for homes around Chelmsley Wood, see rendering in Solihull. Just to the west, we’re also the plasterer in Castle Bromwich.
What our customers say
Was amazed by the punctuality from them as far as tradesmen go and the experience was stress-free with a great finish to my maisonette.
James Tranter
We chose them for our home extension, and the transformation was amazing. Their work is top-notch, and I’d recommend them to anyone seeking both quality and luxury in construction.
Emma S
These guys were great lads, grafted hard, and was really happy with the price and the end result. Blimey, it was outstanding!
Michael T
Very impressed with the workmanship and attention to detail. The project was completed on time and exceeded my expectations!
Sophia Reynolds, Property Manager
Our services
More services: Plastering repairs · Plastering and coving · Plastering extensions and lofts.
Contact RCR
The team has 62 years of combined experience. You can reach us on WhatsApp at 07453 614095 or by email at rcrconnectionsltd@gmail.com, or leave your details on the enquiry page. We reply on weekdays between 7am and 5pm, and on Saturdays between 7am and 1pm.
Plastering in Chelmsley Wood: common questions
Do you cover Chelmsley Wood and the surrounding area?
Yes. RCR Connections Ltd is Birmingham based, covering the whole of the Midlands, and works across Chelmsley Wood and Solihull and the surrounding villages. We also cover plastering in Solihull, rendering in Solihull and Castle Bromwich. For the full list, see areas we cover.
How do I get a plastering quote in Chelmsley Wood?
WhatsApp photos of the walls or ceilings to 07453 614095, with rough room sizes and what you would like done. We will come back with a free, no-obligation quote, or arrange a visit if the job needs a closer look.
Which parts of Chelmsley Wood do you cover?
All of it. That includes Kingshurst, Fordbridge, Smith’s Wood, Bacons End, Marston Green and Coleshill Heath.
Can you replaster a room after a rewire?
Yes. A rewire leaves chases and patches all over the walls. We fill the chases, and if the old plaster has come away we take it back and replaster the whole wall or room, ready for decorating.
Do you replaster rented houses between tenants in Chelmsley Wood?
Yes. We work for landlords and letting agents, patching damage, covering Artex and replastering rooms so the house is ready for decorating before the next tenant moves in.
How soon can I decorate after plastering?
A skim usually needs a few days to dry, and thicker backing coats need longer, depending on ventilation and the time of year. Wait until the plaster is an even pale colour all over, then start with a mist coat (watered-down emulsion).
Can you plaster over Artex?
Yes. We can skim over Artex, or over-board and skim ceilings that are cracked or uneven. If the Artex went up before 2000, have it tested for asbestos before anyone scrapes or sands it.
What hours do you work?