Acocks Green sits on the Warwick Road in south-east Birmingham, between Tyseley, Yardley, Olton and Hall Green. Locals still call the roundabout at its centre “the Green”, and the streets around it hold everything from Victorian villas near the station to the council houses of the 1920s and 1930s that cover much of the area. RCR Connections Ltd is a plastering firm, Birmingham based, covering the whole of the Midlands, with regular work in Acocks Green, Fox Hollies, Tyseley, Olton, Yardley and Hall Green.
The first half of this page tells the story of how Acocks Green was built, in three distinct phases, because each phase left a different kind of wall behind. The second half walks through a typical house from the front door to the loft, then clears up some common myths about plastering.
How Acocks Green got its name
According to the city council’s history of the area, the name comes from the Acock family, who built a large house in the area. The earliest known mention of Acocks Green is in the Yardley parish register of 1604. In 1626 Richard Acock gave Acocks Green House and other estates to his son as a wedding present. That house stood about a quarter of a mile further out along the Warwick Road than today’s Green.
The first settlement, though, was a little further north, around an open field system called Tenchlee or Tenelea, meaning “ten clearings”, which has since disappeared. Moated sites at Huyon Hall and Broom Hall and the Fox family’s farm, which gave us the name Fox Hollies, were among the farms and estates that grew up around it.
Phase one: the turnpike and the canal
Inns and tollgates
Close to the Acocks’ house stood two inns, the Spread Eagle and the Dolphin. Stage coaches stopped at the Dolphin, and when the Warwick Road was turnpiked in 1725 a tollgate was placed across the road there.
The canal brings trade
Late in the 18th century the Birmingham to Warwick Canal was dug across the area, with wharves at Stockfield Road and Yardley Road. According to the council, tiles, bricks, sand and gravel went out, and coal and Welsh slate came in. That trade brought prosperity, the rebuilding of farms and some large new houses.
What survives
Very little from this period is left inside today’s housing, but the canal is still there, and the slate and local brick that moved along it went into buildings across the district.
Phase two: the railway suburb
A station in 1852
The Birmingham to Oxford railway opened with a station at Acocks Green in 1852. The council describes how wealthy businessmen could now leave the dirty, unhealthy town for a pleasant life in the country.
Three hamlets become one
At the time, three hamlets sat along the Warwick Road: Flint Green, Acocks Green and, between them, Westley Brook. Mansions, churches and social life grew up near the station, pulling the centre of activity to Westley Brook, which is where the Green is today. Within a few decades, the council says, Acocks Green had such a rich social and cultural life that it rivalled Edgbaston.
Villas and terraces
This phase gave Acocks Green its larger Victorian houses, many since divided into flats or replaced, and the older terraces and semis close to the station and the Westley Road. Inside, these homes were finished in lime plaster on solid brick, with lath ceilings and decorative cornices in the main rooms.
Phase three: the city arrives
Part of Birmingham
Acocks Green was part of Yardley, which Birmingham absorbed in 1911. Trams reached Broad Road in 1916 and the Green in 1922.
Municipal housing
The council’s history is frank about what happened next. The city was desperate for land for housing, and in a few years from the mid-1920s half of Acocks Green was built on with municipal housing. Much of the countryside disappeared, and the social mix changed quickly. The growing population turned Acocks Green into a major shopping district.
A new centre
The centre was remodelled in 1932, with a large island for the tram terminus. After the trams finished, the island was grassed over and became the Green we know today. Acocks Green Library opened on 14 June 1932, built with Grinshill stone and terrazzo, with oak floors inside.
Since the war
The council notes that since the war, a number of large houses, sports grounds and green spaces have been replaced by higher-density housing. So alongside the Victorian and inter-war homes, there are flats and newer houses built from the 1950s onwards.
Where Acocks Green begins and ends
The council describes the area as about four miles south-east of the city centre. Its boundary runs along the canal on the northern edge and the city boundary on the east, then down Lakey Lane as far as Broomhall Crescent. From there it cuts across to Fox Hollies Leisure Centre, follows York Road to the North Warwickshire railway line, and uses the railway as its western edge back up to the canal. There are two stations: one on the line to Leamington, and another on the Tyseley border on the North Warwickshire line.
Housing today
The council’s page on Acocks Green today describes some terraced housing and a significant number of fine earlier Victorian houses. Large municipal estates lie to the south and west, and two early municipal estates have been rebuilt. Newer building has mostly replaced large houses with small blocks of flats or groups of smaller homes, or covered former sports clubs and nurseries with new estates. Three 1960s towers at Fox Hollies were converted into warden-controlled blocks for older people. For us, that variety means no two jobs in the area are quite alike.
The Garden of Remembrance
The British Legion had kept a temporary Garden of Remembrance in Acocks Green since 1945. In May 1964 it asked for a permanent one outside the library, somewhere “people of all denominations can freely place something to the memory of their lost loved ones”. The council approved the idea just before Christmas 1964, and J White and Sons, memorial craftsmen from Yardley, proposed a paved approach to a cenotaph surrounded by lawns, with part of the library’s front wall lowered to give access.
Planning in Acocks Green
Birmingham has 29 conservation areas, and none of them is in Acocks Green. The nearest are Old Yardley to the north-east and School Road, Hall Green to the south-west. For most homes, plastering inside needs no planning permission at all. Building regulations come in when plastering is part of a bigger project, such as a loft conversion, an extension, removing a chimney breast or insulating walls. Listed buildings are the exception: speak to the council’s conservation team before changing historic finishes in one.
Free, no-obligation quote in Acocks Green: WhatsApp me on 07453 614095 with a few photos, or send us a message.
What each phase means for your walls
Victorian homes near the station
- Haired lime plaster on solid brick, usually in two or three coats.
- Ceilings of lime on timber laths, often with a cornice and a central rose.
- Patches from more than a century of repairs, often in gypsum.
- Damp at low level where outside ground has risen over the years.
1920s and 1930s council and private houses
- Brick walls, some with a cavity and some solid, varying by builder.
- Early gypsum plasters, or lime and gypsum mixes.
- Ceilings of lath or early plasterboard.
- Simple coving and picture rails, often with textured finishes added later.
Post-war and newer homes
- Plasterboard ceilings throughout.
- Block walls plastered or dry lined with board.
- Fewer original features, and more consistent construction.
Knowing which group your house falls into tells us a lot before we’ve even seen it, but every house has its own history of alterations, so we always check.
A walk through a typical house
Here’s what we look at when we visit an Acocks Green home, starting at the front door.
The hall
Halls take a lot of knocks from bikes, buggies and furniture. Corners are often chipped and walls patched. In older houses, the hall may have a plaster arch or a dado rail. We look for loose plaster near the door frame, where slamming doors cause cracks, and around the meter cupboard, where cables and pipes have often been added over the years.
The front room
In older houses, this is the room most likely to have kept its cornice, rose and picture rail. We check the bay window for cracks and cold corners, and the ceiling for signs of sagging. In inter-war homes, the front room often has coving and a textured ceiling.
The through-lounge
Many Acocks Green houses have had the wall between front and back rooms removed. We look at how the opening was formed, whether the beam is boxed and plastered properly, and whether the ceiling has a patch where the old wall stood. Mismatched ceiling heights or two different cornices can make the join obvious, and we’ll suggest how to tidy it up.
The kitchen
Kitchens see steam, grease and plenty of alterations. When units come out, the walls behind them are often patchy. In older houses, the kitchen is usually in the rear wing, where damp is most common. In council-built houses, the kitchen may have been extended or knocked into a dining room.
The back door and utility
Back doors in older homes often sit lower than the outside path, which can let water against the wall. The plaster around the door can be soft or stained. We check the outside ground level and the threshold before deciding how to repair it.
The stairs
Stairwells are tall and awkward, and the walls often carry cracks from decades of movement. We check whether the plaster is firm and whether lining paper is hiding problems.
The bathroom
We look for signs of leaks, condensation and mould, and check what’s behind the tiles. Bathroom ceilings are often stained from leaks in the past.
The bedrooms
Bedroom ceilings in older homes are often original lath, and may have cracked from work in the loft. Chimney breasts and blocked fireplaces are common. Cold outside walls with mould behind wardrobes usually point to condensation.
The loft
A quick look from the hatch tells us how the ceilings below are built, whether there’s been water coming in, and whether there’s insulation. If you’re planning a loft conversion, we’ll check the ceilings below before work starts.
Repairs we carry out
Fresh skims
Where the background is firm but the surface is tired, a thin finishing coat gives a smooth, even wall or ceiling ready for decoration.
Full re-plastering
Where plaster is blown, soft or salty, we strip back to the masonry and apply new backing and finishing coats.
New ceilings
Cracked or sagging ceilings can be overboarded or taken down and replaced with new board fixed to the joists, then skimmed.
Extension and loft finishing
New rooms are boarded, taped and skimmed once the builder has finished the structure.
Making good
Patching after electricians, plumbers, window fitters and kitchen fitters so the repairs disappear under paint.
Damp in Acocks Green homes
Look outside first
Most damp we see starts outside: paths and patios built up against the wall, blocked or broken gutters, leaking downpipes, or render and pointing that has trapped water. Inside, leaking pipes and condensation are the other main causes.
Then deal with the plaster
Once the source is fixed and the wall has had time to dry, plaster that’s soft or full of salts is removed. On solid walls, a breathable lime-based plaster is often the best choice. If a specialist has injected a damp course, their paperwork will usually name a plaster, and we use it.
Condensation in council-built homes
Many 1920s and 1930s houses have cold corners and outside walls where condensation forms in winter. Good ventilation and steady heating help, and lining cold walls with insulated board before skimming can make a big difference.
Textured ceilings
Textured finishes are common in Acocks Green’s inter-war and later homes. If the coating went up before 2000, it could contain asbestos, so get a sample checked by a lab first, before the ceiling is disturbed in any way. The simplest answer is usually to leave it in place and cover it, with a skim over firm texture or new boards over the whole ceiling.
Plastering myths
“You can always skim over anything”
Not true. A thin finishing coat relies entirely on the surface below it. Skimming over loose, hollow or damp plaster just hides the problem until the new coat cracks or falls away.
“Damp means you need a chemical damp course”
Often not. Most damp has a simpler cause, like high ground, a leaking gutter or condensation. Fixing that, and re-plastering with the right material, is often all that’s needed.
“New plaster should be painted straight away”
New plaster must dry first. Painting too soon traps moisture and the paint can peel or blister.
“Lime plaster is old-fashioned and weak”
Lime is softer than gypsum, but that’s what lets it cope with movement and moisture in old buildings. In the right place, it outlasts harder materials.
“Cracks always mean subsidence”
Most cracks in plaster are harmless, caused by drying, temperature changes or minor movement. Wide, growing or diagonal cracks that match cracks outside are the ones to have checked.
“Plasterboard is always quicker and better”
Boarding is quick and flat, but wet plaster is harder-wearing and, on old walls, lime plaster lets the wall breathe. The right choice depends on the room.
“Artex has to be scraped off”
Scraping old textured coatings can release asbestos if it’s present. Covering it is usually safer and quicker.
Updating former council homes
Many of the 1920s and 1930s houses built by the city are now privately owned, and owners are bringing them up to date. Typical work includes replacing old ceilings, stripping wallpaper that has been holding loose plaster together, taking out a chimney breast to make a kitchen bigger, and opening the kitchen into the back room. Some of these houses have had cavity wall insulation added, and a few have had problems with damp afterwards; if your walls became damp after insulation was installed, have the cause looked at before re-plastering. Where the original plaster is sound, a skim is often all that’s needed. Where it’s crumbling, we take it back and start again.
Cornices and ceiling roses
The Victorian villas near the station often still have their original cornices. Where a cornice is cracked or a length is missing, we can repair it by running a new section to match, or by fixing a ready-made length if the pattern is simple. Ceiling roses can be cleaned of old paint and repaired. Keeping these features adds a great deal to a period room, so we work around them rather than removing them wherever we can. If the ceiling is beyond saving, we can try to keep the cornice, or record its profile so a new one can be made.
Choosing the right finish
- A smooth gypsum skim suits most modern and inter-war homes and is ready to paint once dry.
- A lime finish suits solid-walled Victorian houses, where the wall needs to breathe.
- Dry lining with plain or insulated board is quick and works well on cold, uneven or new walls.
- A bonding or backing coat is needed first where the wall has been stripped back to brick.
- Moisture-resistant board makes sense in bathrooms and kitchens.
We’ll recommend the finish that fits your house and how you use the room, and explain why.
Hanging things on new walls
Plasterboard walls need the right fixings for shelves, televisions, radiators and kitchen cabinets. Hollow-wall anchors work for light and medium loads, but heavy items need timber noggins fixed between the studs before the boards go on. If you know where a television or a run of cupboards will go, tell us before we board, and we can make sure there’s solid fixing behind. On solid walls, standard plugs work well once the plaster has hardened.
Seasons and plastering
Cold, humid rooms slow the drying of plaster, so winter jobs need a little more patience before decorating. Frost can damage fresh plaster in an unheated room, so we keep rooms above freezing until the plaster has set. In hot summer weather, the opposite problem arises: the finishing coat can dry too fast and crack, so we keep the room shaded and avoid direct sun on fresh walls. The mild months suit plastering best, but we work year-round.
Questions worth asking any plasterer
- Will you look at the cause of any damp before re-plastering?
- What material will you use, and why does it suit my walls?
- How will you protect floors, stairs and furniture?
- Who will be doing the work, and how long will it take?
- What preparation should I do, and what do you handle?
- How soon can I decorate afterwards?
Good answers to these tell you a lot about how a job will go.
Landlords and tenants
Many homes in Acocks Green are rented, from Victorian flats to former council houses. Between tenancies, we can repair damaged walls, deal with mould-stained ceilings and make good after other trades. Landlords have legal responsibilities for damp and mould, so fixing the cause before re-plastering is important. Tenants who notice cracks, damp or bulging ceilings should tell their landlord promptly.
Before you sell or after you buy
A survey on an Acocks Green house might mention cracked ceilings, damp patches or old textured coatings. We can look at the problem, tell you what’s involved and give a written quote, which can help when agreeing a sale. New owners often like to get the plastering done before moving in, while rooms are empty.
Tall rooms in the Victorian villas
The older houses near the station often have high ceilings, especially on the ground floor. Plastering these needs a safe working platform, so we bring towers or trestles and boards and plan the job so that ceilings are done first and walls follow. Big walls are plastered in one go where possible, because stopping halfway leaves a visible joint. High stairwells may need a staged platform built over the stairs, which we set up so the stairs can still be used at the end of each day.
Chimney breasts
Most older Acocks Green homes have chimney breasts in several rooms, and many have been opened up, blocked off or partly removed over the years. If you’re removing a breast, the brickwork above must be supported properly, and building control needs to be involved. Once the builder has finished, we plaster the wall, ceiling and floor-level patches so the room looks as if the chimney was never there. If you’re keeping the breast, blocked fireplaces should have a vent so the flue stays dry, and old soot-stained plaster may need replacing because the stains bleed through paint.
New partition walls
Splitting a big bedroom, forming an en suite or creating a walk-in wardrobe usually means a new stud wall. We frame it in timber or metal, add sound insulation if you want quieter rooms, then board and skim both sides. Door linings go in at the framing stage so the plaster finishes neatly against them.
Spotlights and ceiling lights
Downlights in a kitchen or bathroom ceiling are easiest to fit when the ceiling is new. If you’re having a ceiling replaced, decide on light positions first and get your electrician to run the cables before we board. Fire-rated fittings may be needed in some ceilings, particularly under bathrooms and between flats.
Tiles and plaster
Wall tiles need a firm, flat backing. When old tiles come off, the plaster underneath often comes away with them. In wet areas such as showers, we recommend cement board or a moisture-resistant board, rather than gypsum plaster. Elsewhere in the kitchen or bathroom, a skim gives a good surface for paint above tiled areas.
Insulating cold walls
Solid outside walls lose heat quickly. Lining them on the inside with insulated board, then skimming, makes rooms warmer and reduces condensation. The room loses a few centimetres, and sockets, skirting and window boards need moving, so it’s best done when other work is planned in the room. On older houses, the type of insulation matters: some products trap moisture in solid walls, so we’ll talk through the options.
Mould on walls and ceilings
Black mould in corners and behind furniture usually comes from condensation, not rising damp. Better ventilation, extractor fans in kitchens and bathrooms, and steady heating are the first steps. Mould-stained plaster can be treated and sealed, or replaced if it’s soft. Insulating the coldest walls stops the problem returning.
A day on site
We arrive at around eight, lay down protection from the front door to the room, and mask off anything that’s staying in place. Old plaster comes off and goes straight into bags. Backing coats go on, then the finish once they’ve firmed up. Before we leave, we sweep and vacuum the work area and the route through the house. If a job runs over several days, we leave everything safe and tidy each evening.
What our quote covers
Our written quote sets out which walls and ceilings we’ll work on, what’s being removed, what materials we’ll use, and how long the job should take. It also notes anything we’ve agreed you or another trade will handle, such as moving furniture or loosening faceplates. If we find something unexpected once the old plaster is off, we’ll stop and talk to you before doing anything extra.
Newer estates and infill homes
Homes built on former sports grounds, nurseries and the plots of demolished villas are usually finished with plasterboard stuck to block walls with blobs of adhesive, often called dot and dab. Common faults include boards that sound hollow, popped screw heads in ceilings, and cracks along board joints. Hollow-sounding boards are often fine, but where they flex or have come loose, we fix them back or replace them. Cracked joints are cut out, taped and re-filled before a fresh skim.
Noise through party walls
In terraces and semis, sound often travels through the wall you share with next door, particularly where chimney breasts have been removed or old plaster has been stripped back to thin brick. A separate lining on battens with acoustic insulation and dense board, finished with a skim, can cut down noise noticeably. Sockets and switches on that wall should be kept to a minimum, since every hole lets sound through.
Spreading the work out
If you can’t do the whole house at once, start with anything that’s unsafe or getting worse, such as sagging ceilings or damp walls, and then move on to the rooms you use most. Doing all the ceilings in one visit and the walls in another is a sensible way to split a large job, because ceiling work makes the most mess.
Plastering words explained
- Backing coat: the thicker first layer that evens out a rough wall.
- Bead: a metal or plastic strip that gives a sharp, strong corner.
- Bonding: a backing plaster for walls that soak up water slowly.
- Dot and dab: board held on a masonry wall by pads of adhesive.
- Haired lime: lime plaster with animal hair mixed in for strength.
- Lath: thin timber strips nailed to joists as a base for old ceilings.
- Mist coat: watered-down emulsion used to seal new plaster.
- Overboarding: fixing new board over an old ceiling instead of removing it.
- Scrim: mesh tape that stops cracks along board joints.
Along the canal and the railway
Houses backing onto the canal and the railway lines can face particular issues. Gardens next to the canal can hold more moisture, so low-level damp on back walls is worth watching. Homes close to the railway sometimes notice fine cracks from vibration over the years; these are almost always cosmetic, and a flexible approach to filling, with scrim tape over the crack before skimming, helps stop them coming back. Where noise from trains is a nuisance, an acoustic lining on the wall facing the line can help, alongside good windows.
Bay windows and front walls
Bay windows are found on many of Acocks Green’s Victorian and inter-war houses. The plaster inside a bay tends to split along the junction between bay and house, because the two parts can move slightly differently. Cold bays also attract condensation, especially behind heavy curtains that trap moist air against the glass and the reveals. Before re-plastering, we check the outside for leaking roofs over the bay, cracked sills and failed pointing. Inside, we can line the bay with insulated board, fit beads to the angles and skim it all to a clean finish.
Lofts, extensions and conversions
Loft rooms
Acocks Green’s semis and terraces are often extended into the roof. The new rooms need sloping ceilings, dormer walls and stud partitions boarded and skimmed, and the stairwell rebuilt. Building control may ask for fire-rated boards along the escape route. The ceilings below often need attention after the work.
Rear extensions
Kitchen-diner extensions are popular on the larger plots of inter-war houses. New walls and ceilings get boarded or plastered, and we bring the old back wall up to the same finish, with a movement joint where old meets new.
Garage conversions
Side garages can become offices or bedrooms. Cold single-brick walls are best dry lined with insulated board and skimmed.
Flats in converted houses
Some of Acocks Green’s large Victorian houses are now flats. Conversions bring partition walls, fire-rated ceilings between flats and plenty of making good. Leaseholders may need permission from the freeholder before work, and the freeholder may be responsible for some walls and ceilings. We can supply a written quote and photos for them.
Working with your other trades
Plastering fits into a sequence. First, structural work and new openings. Then first fix electrics and plumbing. Then plastering. Then second fix, kitchen and bathroom fitting, and finally decorating. We talk to your builder or electrician so we arrive when the walls are ready, and so the trades after us can start without delay.
Preparing for us
- Take pictures, mirrors and curtains down.
- Move furniture out, or into the centre of the room.
- Get socket and switch faceplates loosened by an electrician.
- Warn us about buried pipework or wiring.
- Tell us where we can park on the road.
Looking after new plaster
Allow plenty of time for drying; thin skims are ready sooner than thick coats, and cold weather slows everything. Open a window, keep a little background heat on, and don’t point heaters at the walls. When the colour is even and light, seal with a watered-down emulsion before your main coats. For more detail, read our drying time guide.
Rendering outside
Outside, we apply traditional sand and cement, silicone and K-Rend monocouche finishes, and insulated render systems. Find out more on our K-Rend monocouche and rendering in Birmingham pages.
How to get a quote
- Send photos and rough room measurements by WhatsApp to 07453 614095.
- We’ll come back with a guide figure and arrange a visit if it’s needed.
- We agree a date, protect your home, and get to work.
- We tidy up and give you drying and painting advice.
Areas near Acocks Green
We work across Acocks Green, Fox Hollies, Tyseley, Olton, Yardley, Hall Green, Sparkhill and Hay Mills. See plastering in Hall Green, plastering in Olton, rendering in Yardley, the main Birmingham plastering page, or the full list of areas we cover.
Acocks Green homes we plaster
Acocks Green has Edwardian and interwar homes round the village, with post-war estates around it. Here’s where we work most, the homes you’ll find there and the plastering jobs that come up.
- Acocks Green village. Edwardian and 1930s homes and flats over shops. Through lounges and bay windows.
- Fox Hollies. Interwar homes. Artex ceilings covered.
- Yardley. Interwar semis. Rooms replastered after a rewire.
- Tyseley. Victorian terraces. Blown plaster and chimney breasts.
- Gospel Lane. Post-war homes. Textured ceilings.
- Olton. 1930s semis. Kitchen extensions.
- South Yardley. Interwar homes. Garage conversions and loft rooms.
Whatever the house, RCR Connections Ltd puts 62 years of combined experience into it. We’re Birmingham based, covering the whole of the Midlands, and we work Monday to Friday 7am to 5pm and Saturday 7am to 1pm. WhatsApp me on 07453 614095 or message the page with photos of the room and your road or postcode in Acocks Green.
Outside, we also fit K-Rend monocouche and silicone render for homes around Acocks Green, see rendering in Yardley. Just east, we’re also the plasterer in Olton.
Nearby, we also cover plastering in Hay Mills.
What our customers say
Was amazed by the punctuality from them as far as tradesmen go and the experience was stress-free with a great finish to my maisonette.
James Tranter
We chose them for our home extension, and the transformation was amazing. Their work is top-notch, and I’d recommend them to anyone seeking both quality and luxury in construction.
Emma S
These guys were great lads, grafted hard, and was really happy with the price and the end result. Blimey, it was outstanding!
Michael T
Very impressed with the workmanship and attention to detail. The project was completed on time and exceeded my expectations!
Sophia Reynolds, Property Manager
Our services
More services: Plastering repairs · Plastering and coving · Plastering extensions and lofts.
Contact us
The team has 62 years of combined experience. WhatsApp 07453 614095, email rcrconnectionsltd@gmail.com, or reach us through the contact page. Our hours are Monday to Friday 7am to 5pm and Saturday 7am to 1pm.
Plastering in Acocks Green: common questions
Do you cover Acocks Green and the surrounding area?
Yes. RCR Connections Ltd is Birmingham based, covering the whole of the Midlands, and works across Acocks Green and Birmingham and its suburbs. We also cover plastering in Birmingham, rendering in Birmingham and Solihull. For the full list, see areas we cover.
How do I get a plastering quote in Acocks Green?
WhatsApp photos of the walls or ceilings to 07453 614095, with rough room sizes and what you would like done. We will come back with a free, no-obligation quote, or arrange a visit if the job needs a closer look.
Which parts of Acocks Green do you cover?
All of it. That includes Fox Hollies, Yardley, Tyseley, Gospel Lane, Olton and South Yardley.
Can you replaster a room after a rewire?
Yes. A rewire leaves chases and patches all over the walls. We fill the chases, and if the old plaster has come away we take it back and replaster the whole wall or room, ready for decorating.
Do you plaster new extensions and loft rooms in Acocks Green?
Yes. Once your builder has the walls up and boarded, we plaster the walls and ceilings so the new room matches the rest of the house.
How soon can I decorate after plastering?
A skim usually needs a few days to dry, and thicker backing coats need longer, depending on ventilation and the time of year. Wait until the plaster is an even pale colour all over, then start with a mist coat (watered-down emulsion).
Can you plaster over Artex?
Yes. We can skim over Artex, or over-board and skim ceilings that are cracked or uneven. If the Artex went up before 2000, have it tested for asbestos before anyone scrapes or sands it.
What hours do you work?
Monday to Friday 7am to 5pm and Saturday 7am to 1pm.
